Saryang Middle School Water Tank Replacement, Tongyeong (Venture Nara)
페이지 정보

본문
David Aqua System recently completed a water tank replacement project at Saryang Middle School, located on Saryangdo Island in Tongyeong, Gyeongnam.
Although the project was not large in scale, it involved the removal of two existing tanks (8-ton and 4-ton) and the installation of new K-TANK units.
With the rainy season having just begun last week—and heavy rain hitting the area as the work started—we were initially concerned about potential delays. Fortunately, the weather cleared during installation, allowing us to complete the project smoothly and on schedule.
<Removal Work>
<Installation Work>
The dismantling and installation of both
water tanks were successfully completed in just one day.
One of the key advantages of SMC water tanks is the use of pre-fabricated panels assembled on-site, which significantly reduces both time and cost. Since there is no welding involved, the site remains clean and well-managed throughout the process.
Although the tanks are assembled using bolts, there is no need to worry about leakage. All structural loads are pre-calculated, ensuring safe and hygienic use of the water tanks.
<Venture Nara, operated by Korea’s Public Procurement Service>
David Aqua System is a certified venture
company listed on Korea's official government procurement platform, Venture
Nara (part of the Nara Market system).
We currently have 100 products registered (up to 500 tons in capacity), and we
can also supply custom sizes and specifications upon request.
Feel free to contact us anytime — we’ll be happy to provide you with full
support and consultation.
- 다음글K-TANK’s First Export to India 25.06.04